LOGO ENG SVG
 slogan_en.svg
ÐÓÑ  EN 

Civil construction

Current civil construction involves the implementation of a range of works on erection of buildings and structures for various purposes. This branch focuses mainly on constructing facilities of the nonproduction business sphere: office buildings, sports and entertainment complexes, educational and cultural institutions. There are specific requirements for such facilities as the safety and comfort of many people depend on the quality of construction. Modern office and commercial buildings form the architectural look of cities; therefore these facilities should be not only convenient and reliable, but beautiful as well.

Our work is always distinguished by a high degree of responsibility, impeccable quality of work performed, use of innovative technologies and materials.

Timeframe for implementation: 2012 to 2013

Client: General Directorate of Construction of Krasnodar Region

General contractor: VIS Group

Construction of facilities for winter Olympics 2014 in Sochi has become the most important project for the entire country. We are proud to be involved in this exclusive construction. The Olympics is not only the most modern sport facilities and stadiums, but it is also the most complex engineering infrastructure, without which the competition conduction would be impossible. VIS Group takes part in the Olympics project by constructing several infrastructure facilities.

Backbone water pipeline starting from the water intake of the Mzymta river to the water intake of the Psou river

The project includes project-exploring and construction works for laying water pipes, designed for water supply of Coastal cluster Olympic facilities. 

11 km long water pipeline is divided into lower and upper branches, running along the LowerImeretinsky Valley. From the upper branch water is supplied to the coastal Olympic village and to the Ice arena for figure skating. The lower branch runs along the territory of the Olympic park. 

The route runs in such a way, that water intakes of Mzymta and Psou rivers are looped, providing reliable supply of sport and infrastructure facilities, constructed in Imeretinsky Valley. Backbone water pipeline of Imeretinsky Valley supplies water to the Coastal cluster Olympic facilities: The Fisht Olympic Stadium, the Bolshoy Ice Dome, the Shayba Arena, the Ice Cube Curling Center, the Iceberg Skating Palace and the Adler Arena Skating Center

Thanks to VIS Group experts and erectors the water was supplied to all the ice stadium ahead of the schedule. This allowed to successfully run the test competitions of figure skating, curling and speed skating one year prior to the beginning of the Olympic Games.  

Medium-pressure gas line to the Rosa Khutor Alpine Resort

Along the gas line, which length is 7,835 km, the gas is supplied to the mountain Olympic village. It runs from the elevational mark of +546 m to mark +1153 m above mean sea level. VIS Group is capable of executing the full range of planning and surveying and installation and construction works. 

The gas line is performed of polyethylene pipes, buried in ground and steel ones, buried along processing steps. In total, 12 processing steps across water and other barriers have been constructed along the gas line. The largest of them are the one across the Shumikhinsky creek (66 m long) and the one across Sulimovsky creek (111 m long). The weight of bridge crossing structure across the Sulimovsky creek exceeds 200 tons, it was mounted according to the specially designed project applying the “launching” method.

The construction was carried out in severe climatic and rocky conditions on a tight schedule. Within the scope of the project slopes engineering protection was implemented, expressly, the construction of 436 m long pile-supported back walls of with concrete capacity of 3,030 sq. m. Also, the slopes were protected with geogrid of 1,223 sq. m in are.

Water conduit from backbone network of Krasnaya Polyana village to the Olympic facilities of Rosa Khutor plateau

The route of the high-altitude water conduit passes along the alpine ridge 40 kilometers away from Sochi. What makes this unique hydraulic structure different is its construction was performed in space-confined conditions as two pipelines in the highlands. The significant difficulty was the large height difference, in some sections it constitutes 270 m. For instance, the water intake is situated at the height of 550 m above mean sea level, and the highest point of construction of water pipeline was the elevation mark of 1130 m. In such conditions, in some sites it was difficult to use construction equipment, thus, excavation and pipelaying were performed manually there.  

Also, because of height difference between extreme points of water pipeline critically heavy water pressure of 40 atmospheres was formed. Experts developed technical solution, that enables damping excess water pressure down to standard level of 16 atmospheres. For this purpose, along the entire length of water conduit more than 70 different wells and chambers were placed, fitted with modern hydro-engineering equipment. 

The constructed water conduit guaranteed the athletes and participants of the Olympic Games in Sochi supply with clean drinking water.

Project implementation envisaged three stages:

Stage 1. The construction of 3 km long route from the water intake to the Mountain Olympic village of the Rosa Khutor Alpine Resort. 

On the site there are two water pumping stations, fitted with high-tech equipment, that does not require personnel attendance for operation. The purpose of this site is water supply for construction-assembly works at Rosa Khutor site prior to commissioning of main water pipeline , as well as during test competitions, held December, 2012 to January, 2013. After commissioning of the main water conduit this line operates reverse water feed to supply the facilities of ski resort.

Stage 2. Water supply from backbone water conduit of Krasnaya Polyana village at elevation +550 m to Rosa Khutor Mountain Olympic village at the elevation +1150 m above mean sea level.

The length of the route amounts to 6 km. Most of it runs in the same corridor with a medium-pressure gas line. This site includes processing steps across three water barriers: Sulimovsky, Shumikhinsky and Rzhanoy creeks. The length of processing steps: is 111 m, 66 m and 20 m accordingly. For the purpose of smooth operation of water conduit along the route 6 pumping stations, that operate in automated mode and do not require personnel attendance, were constructed. Their control is performed from Krasnaya Polyana village dispatch station employing GSM/GPRSwireless communication channel. Pumping stations are powered from five newly constructed transformer substations, connected with cable lines of more than 40 km total length. 

Along the route of water conduit the slope protective structures in the form of pile-supported concrete back walls were erected. Their total length is 365 m. The water conduit is also protected from landslides and snow slides by gabion structures (back walls of wire frames, filled with stones). Their length is 673 m, stone mass capacity is 648 sq. m. 

Stage 3. The construction of 1 km long route running from water intake in the region of the Mzymta river high water bed to the lower base of Rosa Khutor with wells and connection chamber arrangement. 

Water conduit Krasnaya Polyana – “Gornaya Karusel”

The project purpose was creation of water supply system to supply consumers. At the site VIS Group has applied the full range of planning & surveying and installation & construction works. 

The length of the route amounts to 6 km. The water supply system is designed for water delivery to “Gornaya Karusel” sport and tourist complex. The route passes in parallel and in close proximity to the route of tourist cable road. This water pipeline is the component part of future centralized system of consumers water to supply for Krasnaya Polyana village district and Olympic facilities located on the Northern slope of the Aibga mountain.

The route of water conduit passes from the point of tie-in into the backbone water conduit at the elevation of +540 m above mean sea level, crosses the Mzymta river on its left bench passes under railroad and along the Northern slope of the Aibga mountain reaches “Gornaya Karusel” sport and tourist complex at the elevation of +960 m above mean sea level. At that, on the slope the water conduit is located along the edge of clearing 17-18 m to the West from the axis of existing cable way. 

The structure is steel pipeline with total length of 2.2 km, consisting of two pipe strings buried in ground, two pumping stations and two retention tanks for clear water, 500 m3 each. Electrical part of the project includes four parts of 10 kv cable line of 6.3 km total length with of three transformer substations assembly and connection at the sites of pumping stations and at the site of retention tanks.

Timeframe for implementation: 2006 to 2011

Client: "Gazprom dobycha Orenburg", LLC

General contractor: VIS Group

In 2011 VIS Group put into commission a complex of buildings for Gazprom dobycha Orenburg, LLC, including “Gazovik” cultural and sports center and industrial health clinic.

Office building is the highest one in Orenburg (78.4 meters, 17 floors) and corresponds to the most advanced construction and architectural standards. House front is made on the basis of exclusive double glazing technology in combination with natural stone lining. “Gazovik” cultural and sports center is a unique facility which has no analogues in the entire Orenburg region.

It includes:

  • Seven gyms;
  • Two swimming pools;
  • Three ballet halls;
  • More than a dozen of amateur art activities studios;
  • A large playing hall with stands for 227 seats with contemporary coating;
  • Winter Garden area of over 1200 square meters.

Timeframe for implementation: 2009 to 2012

Client: "Gazprom dobycha Noyabrsk", LLC

General contractor: VIS Group

VIS Group successfully completed construction works in terms of the project despite severe climate conditions of the Extreme North.

The building consists of five-story atrium and two-storey block connected by a passage. The complex includes the company office, underground parking, medical center with dental cabinet and cultural and recreational area. The total construction area is about 16 thousand sq. meters. The Group has executed a full range of construction works in accordance with the schedule, despite the fact all the works were carried out in the difficult climatic conditions of the Far North.

Timeframe for implementation: 2010

Client: Administration of Yaroslavl

Investor: Gazprom

General contractor: VIS Group 

General designer: VIS Group 

The project was implemented by the 1000th anniversary of the city foundation.

The project included a comprehensive land improvement of the Spit, the confluence of the Volga and the Kotorosl rivers:

  • The Central Promenade arrangement,
  • the Kotorosl River bank protection,
  • Granite paving of the lower tier of the Lower embankment from the Spit to the River Station and the pedestrian zone of the Volga embankment,
  • Granite lining of the staircase to the Assumption Cathedral, stairs and rest areas of the Lower embankment on the area from the Spit to the River Station.

In addition, the project included the fountain renovation and the adjustment of existing lighting and the arrangement of additional lighting of the Spit, including mood lighting of the sculptural group and the Central Promenade.

The project was implemented in a highly tight schedule and was highly appreciated by the region administration. Mr. Dmitry Medvedev attended the gala opening of the embankment.

Timeframe for implementation: 2007 to 2010

Client: Administration of Astrakhan

Investor: Gazprom

General contractor: VIS Group

The project was implemented by the 450th anniversary of Astrakhan.

The embankment territory was significantly expanded and divided into areas: Ceremonial square near the Wedding Palace and the stroll & play area of 1.5 km long.

The following works were carried out under the project:

  • New landscape design created,
  • Fountains constructed and sculpture compositions installed,
  • The embankment lined with pink granite.
Reconstruction and improvement of the embankment was carried out using genuine creative and constructive solutions of designers, architects and constructors.

Mr. Vladimir Putin attended the gala opening of the reconstructed embankment.

Timeframe for implementation: 2009 to 2011

Client: Foundation of preparation for the celebration of the 450th anniversary of the founding of the city of Astrakhan

Investor: Gazprom

General contractor: VIS Group 

The project was implemented for 450-anniversary of Astrakhan and has no analogues in Russia.

Illuminating system of the television tower in Astrakhan (height including pin is 180 m) is executed with consideration of global experience of designing architectural lighting for engineering facilities with use of advanced lighting devices.

Basic works in terms of the project:

  • Installation of all-weather rooflight projectors;
  • Routing subsystems made of color dynamic LED RGB-projectors for “light filling” of the tower;
  • Installation of “belt-light” subsystem composed by 20 thousand LED lamps of different colors.

Timeframe for implementation: 2011 to 2013

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

The Registry office, known as the "House of Life", is a high-tech three-storey building with a total area of over 4,000 square meters. There are located two rooms for marriage registration, equipped with the original broadcast system of a wedding reception, the bride and groom rooms, as well as the entire archive of the city. Panoramic elevator installed in the building allows evaluating all the splendor of the plan of architects and designers.

The project applied the original building materials such as flooring from the Italian master Bartley. The walls inside the building are decorated with tapestries. At the entrance to the Registry office a wrought carriage is installed in which the bride and groom can be photographed for memory.

The "House of Life" meets all the latest safety and comfort requirements. The building is equipped with an automatic control system controlling the operation of all communications, which, in return, reduces resources consumption.

The first Registry office, the appearance of which residents were waiting for 37 years since the settlement of the city, has become one of the sights of the city.

Timeframe for implementation: 2011 to 2013

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

The AIDS Prevention and Control Center is a high-tech medical facility equipped with the latest equipment. The project provides for a high-level automation and control of all engineering systems. Here we have applied solutions that ensure high efficiency of both equipment and design solutions. We have taken into account access demands of people with limited mobility. 

The main building of the Center houses a hospital for 50 persons, a laboratory complex, as well as a maternity ward for infected mothers. The Center will additionally treat hepatitis B and C, as well as various kinds of allergies. 274 professionals will ensure the new medical facility operation.

VIS Group executed the full range of construction works in accordance with the established schedule. Additionally landscaping of the adjacent territory was conducted.

Timeframe for implementation: 2009 - 2011

Client: "Gazprom dobycha Astrakhan", LLC  

General contractor: VIS Group

As a result of the project implementation the territory of the Center has been divided into several functional areas: administrative, sport, and two residential areas for children of junior and senior school age. 

VIS Group experts constructed a multi-purpose sports and leisure center, with a cinema and concert hall, indoor sports facilities, a canteen, a library, and cyber cafe.

There is also a summer theater, indoor and outdoor pools, and sports grounds on the territory of the center. The center now has also dancing and bonfire grounds, and a fountain. The general project plan also involved the construction of an administrative building, staff residential houses, and planting of the territory.

Timeframe for implementation: 2011 to 2014

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

The project provides for a three-storey building of unusual architectural form – two rectangular buildings are connected with central atrium, which houses a library, cinema and concert hall for more than 220 people. The top of the atrium crowned with a decorative metal dome.

The left wing of the school also performed with the use of non-standard architectural solutions – the pavilion in the form of a glazed cone includes a small hall for demonstrations and music classes. The right wing houses the classic, historical, residential and modern dance rooms. Recording studio, dressing room and a spacious warehouse for scenery will be adjacent to the rehearsal hall for the academic concerts.

In addition to the construction of the school building project includes extensive landscaping of the adjacent territory. It provides for the establishment of:
• School of the Arts Central Alley;
• The exhibition area with lawns and flower gardens;
• Parking for 59 cars for personnel and guest vehicles.

Timeframe for implementation: 2013

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

VIS Group acted as a general contractor on the construction project of the kindergarten in Tazovsky (Yamal-Nenets Autonomous District). The building is designed for 240 children, including places for children with delayed mental development and severe speech disorders.

The building housed the kindergarten classrooms, gym, music and sports halls, and swimming pool. The adjacent territory was landscaped, including the construction of recreational verandas, modern playgrounds, small architectural forms and landscaping lawns.

Timeframe for implementation: 2011 - 2015

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

VIS Group carries out a full set of construction and installation works related to the erection of a modern Ice Arena in Nadym. The total area of the three-storey building is over 6,000 sq. m. 

The Ice Arena is designed to have 500 seats and special equipment for the disabled persons. On the first floor in addition to the ice arena itself there will be changing rooms for hockey players, a gym with changing rooms, and sauna, premises for ice resurfacers and the entrance for guests. 

On the second floor there will be room for acrobatics, coachers' facilities and a TV studio. Two skyboxes and other administrative facilities are located on the third floor. The project also includes an entrance for visitors who go skating, with a skate rental, changing cabins and rooms. 

The surrounding area will have a convenient parking lot for 42 cars including 10 places for disabled persons. The project also includes lawns and other improvement elements.

Timeframe for implementation: 2011 to 2014

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

Sports Palace includes a multi-purpose hall team sports and swimming pool with a cup of ski jumping. The total area of ​​the sports complex is about 7000 square meters.

According to the designers building is three storeys of different spatial volume. Allocated volumes premises gym, pool hall, the viewing area, administrative and service and support facilities. The complex includes a universal gym for volleyball, basketball, mini-football, as well as two swimming pools area of ​​1692.2 and 175.6 square meters.

Timeframe for implementation: 2011 - 2013

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

VIS Group has implemented the project of one of the most innovative kindergartens in YNAD within a record time — one year and ten months. YNAD Governor Dmitry Kobylkin noted in his speech during his visit to the construction site that the new building became a true adornment of this residential neighborhood.

This kindergarten has rooms for 12 groups of kids of various ages and also has a gym and a music room, a swimming pool, a medical unit and a physical therapist's office. Professional psychologists and speech therapists work with children. 

The development of the surrounding area has been also performed: planting of pines, installing of border stones, paving of sidewalks, covering the children's playing ground with wood, asphalt paving and lawn planting. The total area is over 9,000 sq. m.

Timeframe for implementation: 2011 - 2012

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

The complex constructed by VIS Group has four floors and is connected to the rest of the clinic via a heated passage. There are all the things which are necessary for the examination and treatment of children: from laboratories and exercise therapy units to psychological support rooms. The building has specially constructed salt caves which is particularly important regarding the climate conditions of the Far North. 

VIS Group carried out a full set of construction and installation works and purchased the necessary medical equipment including ultrasound machines, hot tubs and the Salekhard's only children robotic system Lokomat.

Timeframe for implementation: 2014 - 2014

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

In August 2014 VIS Group won the open tender organized by the YNAD Directorate of Capital Construction to complete the construction of three-storey building of a kindergarten for 300 children.

The project involved completing the interior works, equipping the facility with all necessary equipment, and the development of the surrounding area that includes night lighting of the facades and decorative lighting installation, landscaping construction and grass planting.

New pre-school educational facility of a total area of 9,000 sq. m accommodates 17 groups, including 6 nursery groups, 9 pre-school groups, and 2 speech therapy groups. In order to ensure the comprehensive development of pupils there are two music rooms and gyms, theater studio with a wardrobe, sewing and carpentry workshops in the kindergarten. There are summer terraces, sport and play grounds for outdoor activities.

Timeframe for implementation: 2012 - 2014

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

VIS Group was the general contractor in the construction of a two-storey kindergarten for 120 children in Noyabrsk.

The kindergarten includes premises for 6 groups for kids aged 1.5 to 7 years, speech therapist and education psychologist rooms, a medical unit, a music hall, and gym. There are also walking terraces for children to walk in winter. 

The total area of the building is more than 2,000 sq. m.

Timeframe for implementation: 2011 - 2014

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

In 2014 for the new school year the biggest boarding school in Tazovsky got a new dormitory block. The total area of the dormitory block is 12 thousand sq. m. The three-storey building has been designed to accommodate 260 children and includes bedrooms, homework preparation rooms, a canteen and medical unit. 

Apart from the general construction and installation works the development of the surrounding area was also carried out: children's playing and sports grounds were constructed, illumination of the territory was performed, pedestrian facilities and driveways for staff vehicles and fire-fighters were constructed.

Timeframe for implementation: 2011 - 2015

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

VIS Group is the general contractor for the construction of Sadko Social-Rehabilitation Center in Novy Urengoy.

This unique center is designated for the provision of social, psychological and other help to children, and their parents or legal representatives. Social rehabilitation experts shall assist those young people in recovering their social status of minor and returning to their families. 

The building of the center includes all the things which are necessary for rendering comprehensive help to those who need it: medical care rooms, psychological help and social rehabilitation rooms, reception, as well as administrative and maintenance rooms with catering facilities and laundry.

There is also a gym, events hall, library with a reading hall and book depository, swimming pool, sewing and shoes repair workshops in the Center. Here children will be taught dancing and music, sewing, carpentry and the basics of modern information technologies. The complex also includes two residential units — for girls and for boys, as well as rooms for disabled children. There are public rooms and bedrooms, as well as cloak room and canteen in each unit.

Timeframe for implementation: 2011 to 2016

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

"Zvezdny" is the largest sports complex of international level in the Yamal territory. The total building area is about 23,000 square meters.

Under the guidance of VIS Group experts, the project undergone several changes to meet not only Russian but also international standards. As a result, the layout and purpose of some premises were changed, special events to ensure fire safety executed, large hall capacity extended from 1600 to 2040 seats.

Today the complex consists of over 10 sports & other halls, including a large multi-purpose hall, game hall, hall of dance, aerobics, wrestling, boxing, weightlifting, table tennis, gym and billiard halls, shooting range for 25 and 50 meters. Its total training throughput per day amounts to almost 3,000 people. The complex will engage 130 specialists, including instructors working with children.

“Zvezndy” became not only a sports site of a new level, but also a place of the organization of cultural, entertainment and recreational activities. For this purpose, VIS Group specialists installed the most modern multimedia equipment, allowing carrying out any show program. Special cladding panels in a large multi-purpose hall allow achieving high quality sound. It also has transformable stands, which are easy to move in and out depending on needs of event organizers.


Timeframe for implementation: 2013 - 2017

Client: Government of the Yamal-Nenets Autonomoous District

General contractor: VIS Group

This is the first project of public-private partnerships in the region. By attracting a private investor – VIS Group – district has managed to address the acute problem of shortage of places in kindergartens and to create fundamentally new conditions for the development of the modern system of preschool and school education.

Construction of two kindergartens for 300 children in Salekhard
Modern 3-storey buildings each can accommodate up to 17 groups, including nursery and speech therapy groups. Besides, the buildings have medical units, speleochambers, and swimming pools where pupils are able to learn how to swim, and take special health-improving courses. 
There are also fine art studios, theater workshops, computer, sewing, carpentry and dancing classrooms for children's leisure activities.
On the third floor of the kindergartens winter gardens, planetariums, music halls and gyms, as well as private museums are located.

Construction of kindergarten for 240 children in Novy Urengoy
The total area of the building is more than 7.5 thousand sq. m. The three-storey kindergarten accommodates group units, a swimming pool, 2 winter gardens, a dancing classroom, and medical facilities with physical therapist's office. For the convenience of small citizens, elevator was installed, as well as indoor and outdoor walking verandas.
Modern technologies, security system were applied. Interactive boards also were installed, computer labs equipped, and interactive floors mounted.

Construction of kindergarten for 80 children in Gorki village
The kindergarten was built in the south-eastern part of Gorki village. The total area of the building exceeds 3,200 sq. m, and it is enough to comfortably accommodate up to 80 pupils. There are nursery and pre-school groups, psychologist and speech therapist's offices, a public room for music and sports, heated terraces and a medical unit. 
The kindergarten territory was equipped with grounds for groups, a public sports ground and cycle lanes.

Construction of kindergarten for 300 children in Tazovsky
The standard construction design for Salekhard kindergartens was also used in the construction of the kindergarten for 300 children in Tazovsky: the kindergarten is one of the most innovative in the town. 
Much attention was given to children's leisure time and their comprehensive development. Here preschooler can learn how to dance, paint, and sing. Teachers also pay a special attention to computer studies. Giving the climate conditions of the region, the building also has a speleochamber, and swimming pool. 

Construction of a joint school and kindergarten building for 200 and 120 children in Muravlenko
The modern building consists of two blocks to comfortably accommodate a kindergarten, and school for 120 and 200 children respectively. The total area of the educational facility is over 11,000 sq. m. 
In addition to classrooms and group units, there is a gym and events hall, a library, a laboratory, and winter garden. The building also has facilities for clubs and extra-curricular activities.

Timeframe for implementation: 2015 to 2018

Client: "VIS Infrastructure", LLC 

General contractor: "VIS Infrastructure", LLC 

In December 2014, VIS Group (represented by its subsidiary VIS Infrastructure) and the Department of Health of the Khanty-Mansi Autonomous District – Yugra signed the Agreement on the design, construction, equipping and maintenance of Surgut clinical perinatal center.

New high-tech center will provide comprehensive services in the field of child-bearing support, advanced treatment and prevention of fetal disorders, neonatal surgery. In contrast to the usual maternity hospital here are to be diagnosed and treated mothers & babies’ complex diseases with the use of robotics and the most modern medical equipment from Europe and the USA. 

According to the project, the building of three blocks is designed for 10,000 births per year. The institution would take more than 300 pregnant women at the same time. The hospital complex has several maternity wards, an operating unit for 15 simultaneous operations, intensive care of mother and child department. There also to be a consultative and diagnostic center. Breast cancer center, equipped MRI and CT offices, as well as the department of reproductive technologies with IVF laboratory, which was a long awaited expansion of the Surgut physicians, are to be organized. In addition, there will be jobs for ophthalmologists, dentists, endocrinologists, urologists and many others. 

Expectant mothers will get all the necessary assistance in terms of preparation for childbirth: school of parents, physical therapy room, reflexology and ozone therapy offices, underwater massage room, altitude chamber. 

The Department of gynecology is to operate based on the Center. Especially for students' practice there will be in-training center with a maternity room, operating theaters, intensive care unit. Equipment classrooms, computer labs, conference rooms for 120 people, library and archives are also designed.

Timing of construction of such an important social facility for the region is about 3 years. Its total area is over 60 thousand sq. m. It is assumed that at the time of commissioning in 2018, this center will be the largest in Russia. 

Agreement on public-private partnership provides for operation of the perinatal center for 7 years after commissioning.

Timeframe for implementation: 2016 - 2019

Client: Government of the Republic of Sakha (Yakutia)

General contractor: VIS Group

On December 2015, VIS Group had won an open competition of The Republic of Sakha (Yakutia) Ministry of Economics for the right to conclude an Agreement on public-private partnership for the design, construction and maintenance of pre-school, general, supplementary education and culture facilities in the city of Yakutsk.

Construction of the Arctic International School for 220 pupils

Academic unit of the Arctic International School is going to be built in the territory of "Pinery" Rest and Health Center. Six blocks of different heights, including a separate sports unit, will be designed for 220 pupils. The total area of the building exceeds 7,200 square meters.

Design of the future building provides the organization of the most comfortable learning process for all school groups. Own laboratory will be set up in the classes of biology, chemistry and physics, and computer science. A library with a spacious reading room and book depository will ensure the needs of the school in the academic literature. Pupils will be able to relax during break in spacious lobby with a fountain and recreational area with a winter garden. There will also be organized training center’s open space.

To conduct creative meetings will be built assembly hall with wardrobe and a room for scenery and props. Individual music lessons, which include piano, string and wind instruments, will be organized in the school. A modern multimedia conference room for 50 people will be in educational building for research activities. The school will also run its own planetarium, the Museum of the Arctic civilization and cinema room.  

Sports life is organized in a separate unit, which will house a spacious swimming pool, sports and dance halls. To organize training provided inventory, the coaching room, showers and changing rooms for boys and girls. At the swimming pool will be created footbath for the prevention of children's health. Water quality monitoring will be carried out in a special laboratory analysis, located directly in the building.

In the landscaped area of the school will be located a platform for mobile games and sports - basketball, volleyball, soccer and gymnastics in combination with the sectors for the long jump and the height jump.

Construction of “Àéûû Êûhàòà” National School for 550 pupils

Àéûû Êûhàòà” National School will be located in the 203th district of Yakutsk. The three-storey building provides all the necessary to ensure the smooth and easy learning process. It will create the conditions for employment not only in the school curriculum, but also in other clubs, participation in community organizations and sport events. Classes’ size does not exceed 25 people. Elementary and high school will have separate dance and gym halls equipped with locker rooms and showers.

The aim of the implementation of the PPP project in Yakutsk is the improvement of material and technical base of education and culture of the city. Following this task, the school will be set up with media audiences with interactive whiteboards for lessons, lecture rooms, language classes with equipped laboratories, and workshop for electro technology. Art education of the pupils will be organized in their own folklore theater-studio with wardrobe and dressing room. Singing and folk instruments office is also provided. In addition to standard medical unit own dental office, study psychologists and social workers will work here.

The adjacent area envisages the creation of playgrounds for different age groups. Sports grounds are made of coating harmless to children's health. Places are designed for various kinds of games: basketball, volleyball, soccer and gymnastics. Around the football field and basketball court will be organized running tracks and playground for a quiet relaxation.

Construction of a multifunctional entertainment complex – Cultural center named after Y.A. Gagarin with a cinema for 500 seats

Cultural center named after Y.A. Gagarin aims to become a center of cultural and business life of the city. Equipped with the latest multimedia and audio equipment, this multifunctional entertainment complex will host not only the areas of clubs, but also office and retail spaces.

The total area of the building exceeds 6,000 square meters. On the ground floor will be organized a concert hall with a stage and seats for 500 spectators.  For open meetings provided a large hall with a café and dressing rooms. The second floor will host children's recreation center, library with reading room, youth club, a winter garden, a dance hall and a club with a multipurpose room with a capacity of 250 visitors. On the third floor, there are rooms for art: the artist's room, workshops and rooms for different study groups.

The adjacent area will host sidewalks and driveways, with organized safe vehicular traffic. The project envisages the creation of facilities’ day & night lighting: floodlights will be installed for recreational areas, as well as street and park lighting with soft light. In addition, work will be carried out on gardening and landscaping of recreation areas.

Construction of Children’s Arts School for 300 pupils   

At the end of the project in 203th district of Yakutsk will be a new children's arts school. The building of three floors with a total area of over 4,500 square meters can accommodate up to 300 children, providing everything necessary for a variety of activities. It will be equipped with three groups for music classes, 23 classes for individual lessons, multi-purpose hall, stage, costume and artistic room.

Young residents of Yakutsk will be able to enroll in dance and theater groups, as well as learn to play the national musical instruments, including a guimbarde. VIS Group fulfills all the necessary acquisition of school music equipment, including the world-famous brands such as Yamaha, Wisemann and Hohner.

Gardening and outdoor lighting of the Arts School is provided by individual design project. Landscaped area of the new school will be a comfortable place for leisure activities of pupils and their parents.

Construction of a library

Formation of a new cultural environment of 203th district of Yakutsk will be completed by the construction of a library with a book depository volume up to 130 thousand books. The library's collection will consist of works from the extensive school curriculum, as well as popular literature of Russian and foreign authors. There will be a separate reading and subscription halls, elementary, middle and high school halls, as well as a leisure area and a game room for the kids. Classes of an artist and different study groups will operate on a year-round basis. In addition, the project provides for the establishment and acquisition of an online class.

A cafe located directly in the territory of the building with the capacity up to 50 guests is also to be constructed. The library will also operate the center for the study of reading with scientific-methodical department, department of psychology, sociology and pedagogy of children's reading.

The project is to provide the library with all necessary facilities for comfortable operating. Needs of restoration and repair of the books will be provided by its own department of technical creativity, publishing and copying laboratory will print and copy all the necessary works.

Construction of school No. 25 for 350 pupils 

School for middle and high classes will be built in Yakova Potapova Street in 92th district of Yakutsk. The three-storey building with area of over 6,000 square meters is designed for 350 pupils.

In addition to the standard school curriculum pupils will be assisted with career guidance to prepare for entrance exams to higher educational institutions and to develop useful skills.  The school will host its own library with reading room, sports and assembly hall with wardrobe and dressing rooms. For all-round development of pupils, there will be classes of Russian national culture and indigenous cultures, computer lab, as well as the office of basic military training with weapons storage facilities.

The Group is building all the educational, cultural institutions in accordance with the requirements of high efficiency, advanced materials are used in the exterior and interior decoration, installation of ventilated facades, as well as cladding of granite is provided. Access for people with limited mobility is arranged by ramps with non-slip coating.   

Construction of school No. 6 for 500 pupils 

The three-storey building in Avtodorozhnaya Street in the city of Yakutsk is designed for 500 pupils. The total area is more than 8 thousand square meters.

There will be trained all age groups, from primary to high school. Vital functions of the pupils will be fully provided by production capacity of the building: equipped with modern equipment classrooms and labs, including language laboratories and lecture rooms, own kitchen and a spacious dining room, landscaped recreational areas. For active sessions assembly, sports and gyms are provided.

Interior decoration of all rooms is made of natural materials, harmless to health. Security and fire safety of pupils and teachers will be provided with the most modern equipment and surveillance cameras around the perimeter of the school grounds.

Construction of two kindergartens for 315 children each 

Two modern kindergartens for 315 children each will be built in 203th district of Yakutsk, which will fully meet the needs of the surrounding areas. Performed by individual design projects, both buildings will be designed for 18 groups, including nurseries, and preschool speech therapy gruops. Three-storey buildings of a total area 4500 square meters each will host groups equipped with toys and educational materials, will be equipped with elevators, separate computer equipment rooms will be set up. There are spacious gymnastic and music halls, and in the second kindergarten will be additionally created a pool for swimming training of preschool children. Custom carpentry for boys and girls are to help teachers to conduct classes with the use and interest.

Medical units of kindergartens are equipped with modern equipment, including everything you need, like measuring boards, apparatus for the determination of flatfoot in babies, lung-testers and much more. A therapist and psychologist will be working in kindergartens on a permanent basis.

On the adjacent site located area for outdoor games for the younger, middle and older groups respectively, and for sports games, as well as place for quiet relaxation. The project involves the provision of a safe road traffic in the territory of the kindergartens, the installation of outdoor day & night lighting.

Construction of a kindergarten for 240 children in Syrdakh village

The PPP project also envisages the construction of a kindergarten in the village of Syrdah, located 82 kilometers north of the capital of the republic. Built in accordance with the high demands of modern buildings and the standard project of urban kindergartens, erected in Yakutsk, the building can accommodate as many as 240 pupils.  Its total area is more than 3,500 square meters.

In addition to the groups, designed for 12 nursery, preparatory, secondary and senior ages, there will be arranged joinery and sensory room, room of additional education, sports and dance halls, a hall for music lessons, stage and children's theater. The medical unit will be hosting a therapist and psychologist, as well as psychological training hall. Methodical work of teachers will be done in the office with Internet library.

The outdoor playgrounds, as well as walking verandas, will be equipped with everything needed for organization of leisure of the children. Each sports and playground will be covered with a special dust-free coating, harmless to the health of the children. Comprehensive landscaping and arrangement of flowerbeds and lawns will ennoble the whole surrounding area.

Construction of kindergarten No. 75 for 240 children

This kindergarten will host up to 240 children. The total building area is 3500 square meters. Three floors will accommodate groups for nursery, preparatory, middle and senior groups.

There will be general gymnastic and dance halls, pool and a hall for music lessons. For the development of coordination, fine motor skills of hands and creative thinking in kindergarten will work joinery, sensory room and a room of additional education. On site will be organized recreational verandas for winter and summer sports and playgrounds for each age group. In addition, children's theater will be created where teachers can work with preschoolers on theatrical art and to create their own performances.

Construction of kindergarten No. 30 for 200 children

A kindergarten for 200 children will be built in Pionerskaya Street. There will be 11 working groups, including nurseries and speech therapy groups. The number of pupils is less than 15 people in the lower and less than 20 people in the older groups, which is optimal in terms of providing a comfortable learning process for both teachers and children.

The total building area exceeds 3,400 square meters. On three floors there are playing, sleeping and training areas, gym, music hall and theater studio. For the comprehensive development of children will be arranged offices of computer equipment and fine arts. The project also envisages the construction of the pool of 60 square meters area, where older pupils can take swimming lessons with professional trainers. Physiotherapy, dentist, psychologist and speech therapist complement medical unit, among other facilities. A sensory room will be arranged separately.

The adjacent territory of the kindergarten will be divided into areas for training of junior, middle and senior groups and adequately staffed with gaming and sports projectiles, small architectural forms. There will be arranged flowerbeds and lawns, and a comprehensive landscaping carried out. 

Timeframe for implementation: 2011 - 2018

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

VIS Group carries out a full set of construction and installation works related to the construction of an administration building for the YNAD executive bodies of the state authority in Salekhard. The total building footprint is about 5,000 sq. m, the building is designed to accommodate 1,300 employees. 

According to the design the building shall consist of 7- and 8-storey units. Both units are inter-connected and will be equipped to be utilized as offices. On the bottom floors, there shall be administrative rooms, a canteen, a cloakroom and technical facilities.

Timeframe for implementation: 2012 to 2017

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

Construction of the project will allow to shape a safe and secure coastline and become one of leisure area for townspeople. The retaining wall being erected will protect the embankment from the constant caving and wave influence erosion.

  • Length of the embankment being landscaped is 1,400 meters,
  • Its area shall be about 7.3 hectares.

The project includes fencing, stair approaches to water side, pedestrian area, lighting, landscaping, hard landscaping. The pavement will be made of granite. There will be fountains, including a fountain with a deer statue, a lighthouse-like stele, "Raw-Hide Tent" monument, and a caf?.

Timeframe for implementation: 2014 - 2019

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

On December 2014, VIS Group adopted unfinished construction of a kindergarten in Gubkinsky (Yamal-Nenets Autonomous District). 

Two-storey building will host 330 children. Total area is up to 16 000 sq. m. Twenty groups, including nurseries, adaptation and training groups will work here. In addition to the working classes here are also to be swimming pool, sports and assembly halls, computer room, and a separate medical unit. The extensive landscaping of the territory includes sports- and playgrounds, architectural forms, lawns landscaping and planting flowerbeds.

Construction completion was quite an acute issue for local authorities. After adopting the project by VIS Group specialists, it was decided to adjust the design and estimate documentation with regard to the requirements of modern safety standards and equipment of similar objects. In addition to complete interior finishing and technical equipment, work include supporting structures framework strengthening, replacement of floor slabs, the dismantling of the entire floor structure.  

During 2015 the building will be completely renovated inside & outside.

Timeframe for implementation: 2012 - 2018

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

Doverie Social-Rehabilitation Center that is under construction in Salekhard by VIS Group is aimed at serving as a place of comprehensive help for children, teenagers, and families with children, who are in a difficult situation, as well as the place performing preventative measures of child neglect. 

The total area of this 3-storey building for 100 people is almost 12 thousand sq. m. The Center shall have all the necessary facilities for the implementation of social rehabilitation programs. The Center shall accommodate 5 groups of children aged 3 to 15 years for 24-hour stay, and 6 day groups including 3 groups for disabled children. There shall also be crisis and rehabilitation units for rendering urgent medical and psychological help. Doveriye SRC will also accept children who on their own left their disadvantaged families and facilitate their social rehabilitation. 

The Center shall employ nursery teachers, social care teachers, psychologists, speech therapists, lawyers and the local social service. Computer classrooms, play and relax rooms, physiological help and speech therapy rooms shall be built. The Center will also focus on medical care provision: there shall be gyms, swimming pool, massage and therapeutic exercise rooms, a sauna, an aerosol inhalation room, a radiation therapy room, and phyto-bar. 

The Center will have events and conference halls with all necessary multimedia equipment, a ballet room, fine arts, sewing and industrial arts classrooms and a library with a book depository. 
In order to facilitate the recreation of children and teenagers, the area of the Center will be divided into functional zones. The construction of sport and play grounds and a winter walking terrace is also planned.

Timeframe for implementation: 2012 - 2018

Client: YaNAD Management of Capital Construction and Investment 

General contractor: VIS Group

The YNAD State Archive building was designed to have 5 floors and used for the storage of 265,000 folders of documentation. The complex of main and auxiliary premises includes archives, offices of archive workers, a reference and research library with a reading-hall, an exhibition hall for 100 people, a conference hall for 70 people and other facilities. Night illumination of the building facades and decorative illumination are planned to be installed. 

The project also involves the development of surrounding area: landscaping, lawn fencing, illumination of the yard. Besides, a motor vehicle parking for the workers of the Archive, and guests will be constructed.

Timeframe for implementation: 2017 to 2019

Client: Government of the Novosibirsk oblast 

General contractor: "Ecology-Novosibirsk", LLC

In September 2017 VIS Group has acquired 75% of "Ecology-Novosibirsk", LLC. The company acts as a concessionaire for the construction project in the Novosibirsk oblast waste sorting facilities and all associated infrastructure. 

The respective concession agreement was signed in July of 2016 between "Ecology-Novosibirsk", LLC and the Government of the region. The project includes two sorting plant for household waste with the capacity of 400 thousand tons each, two landfill capacity 297,2 thousand tons and all necessary infrastructure. The agreement is concluded for a period of 40 years.

The construction of the facilities is scheduled to perform at the expense of the concessionaire's investments will amount to 6.5 billion rubles. Both plants will become the property of the region immediately after construction, their operation and for the duration of the agreement (until July 2056) to be provided by the concessionaire.

Business geography